Photos
facilityOS
Powered by Saturday Maintenance

BILLING & REQUESTS

Property: Sample Property
Audit Date: February 2026
Total Items: 42 Items (20 Red + 22 Yellow Priority)
Note: All pricing shown on this page is sample/demo data for illustration purposes only and does not reflect actual quoted costs.

Pricing Summary

February 2026 Assessment
Total All In
$24,138.00
Total Red Priority
$12,558.00
Total Yellow Priority
$11,580.00
Total Labor Cost
$17,325.00
Total Material Cost
$6,813.00
Total Labor Cost (Red)
$8,588.00
Total Material Cost (Red)
$3,970.00
Total Labor Cost (Yellow)
$8,737.00
Total Material Cost (Yellow)
$2,843.00

Red Priority Pricing

$0.00

R1. Rooftop HVAC Filters (Aeon Unit)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Immediate replacement of rooftop Aeon unit HVAC filters (24x24x4 and 24x24x2). Filters need immediate replacement per assessment findings. 1.00 $85.00 4 $32.00 $213.00
Subtotal: $213.00

R2. Expired Fire Extinguishers - Retail Space

Description Labor Qty Labor Rate Material Qty Material Cost Total
Replace expired fire extinguishers in retail space (expired Oct 2024 and Oct 2023). Includes procurement and installation of new units. 1.50 $85.00 2 $150.00 $428.00
Subtotal: $428.00

R3. Generator Inspection & Load Testing

Description Labor Qty Labor Rate Material Qty Material Cost Total
Schedule professional inspection and load testing for rooftop generator. Last inspection approximately October 2014 - CRITICALLY OVERDUE. Includes pigeon nest removal and initial debris cleanup. Includes vendor coordination fee. 8.00 $85.00 n/a n/a $2,800.00
Subtotal: $2,800.00

R4. Wall Street Exterior Lighting Repair

Description Labor Qty Labor Rate Material Qty Material Cost Total
All exterior lights on Wall Street side are out. Includes broken fixture with exposed wires - electrical hazard. Repair/replace all fixtures and restore full exterior lighting. 6.00 $85.00 4 $765.00 $1,275.00
Subtotal: $1,275.00

R5. Fire Door Adjustment Project (Building-Wide)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Fire doors on floors 4, 5, 6, and 7 not latching properly. First floor fire doors rubbing on floor. Includes adjustment of door closers, latch mechanisms, and planing/adjusting doors as needed. 12.00 $85.00 8 $680.00 $1,700.00
Subtotal: $1,700.00

R6. Electrical Room Clearance (Building-Wide)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Electrical closets on floors 2-6 being misused for storage. Clear all items, enforce 36-inch minimum clearance from panels. Install proper signage and locking mechanisms. 6.00 $85.00 5 $170.00 $680.00
Subtotal: $680.00

R7. Exit Sign & Emergency Light Replacements

Description Labor Qty Labor Rate Material Qty Material Cost Total
Replace exit sign #15 on sixth floor (not working), faded rooftop exit light, and non-standard fixtures throughout. Includes 6 units total. 6.00 $85.00 6 $1,020.00 $1,530.00
Subtotal: $1,530.00

R8. Expired Eyewash Station Replacement

Description Labor Qty Labor Rate Material Qty Material Cost Total
Replace expired eyewash station in mechanical penthouse (expired 2024). Maintenance shop station good until 2027. 1.00 $85.00 1 $255.00 $340.00
Subtotal: $340.00

R9. Stairwell B Security Repairs

Description Labor Qty Labor Rate Material Qty Material Cost Total
Repair broken stairwell B first floor lock (busted/broken), non-working FOB reader, and broken stairwell A garage door handle. Includes hardware and labor. 3.00 $85.00 3 $340.00 $595.00
Subtotal: $595.00

R10. Fire Command Control Room Access

Description Labor Qty Labor Rate Material Qty Material Cost Total
Obtain/replace keys for fire command control room (currently unable to access). Verify fire panel operation once access is established. Includes lock service and key duplication. 2.00 $85.00 1 $85.00 $255.00
Subtotal: $255.00

R11. PPE Station Setup

Description Labor Qty Labor Rate Material Qty Material Cost Total
Establish PPE station in maintenance shop. Includes equipment, signage, and setup. Populate empty SDS binder with current safety data sheets. 4.00 $85.00 1 $510.00 $850.00
Subtotal: $850.00

R12. SDS Binder Creation

Description Labor Qty Labor Rate Material Qty Material Cost Total
Populate SDS binders with safety data sheets for all chemicals on site including janitorial closet chemicals. OSHA compliance requirement. 4.00 $85.00 n/a n/a $340.00
Subtotal: $340.00

R13. Snow Logs - Documentation System Setup

Description Labor Qty Labor Rate Material Qty Material Cost Total
Setup for creating snow log documentation system. Snow removal logs not found during assessment. Includes system design, template creation, and initial setup. 1.75 $85.00 n/a n/a $150.00
Subtotal: $150.00

R14. Boiler Logs - Documentation System Setup

Description Labor Qty Labor Rate Material Qty Material Cost Total
Setup for creating boiler log documentation system. Boiler logs not found during assessment. Includes system design, template creation, and initial setup. 1.75 $85.00 n/a n/a $150.00
Subtotal: $150.00

R15. Moisture Logs - Documentation System Setup

Description Labor Qty Labor Rate Material Qty Material Cost Total
Setup for creating moisture log documentation system to track moisture levels, water intrusion events, and related maintenance. 1.75 $85.00 n/a n/a $150.00
Subtotal: $150.00

R16. Utility Logs - Documentation System Setup

Description Labor Qty Labor Rate Material Qty Material Cost Total
Setup for creating utility log documentation system to measure utility rates each month. Includes system design, template creation, and initial setup. 1.75 $85.00 n/a n/a $150.00
Subtotal: $150.00

R17. Unlabeled Circuit Breaker Labeling

Description Labor Qty Labor Rate Material Qty Material Cost Total
Label unlabeled circuit breaker box and verify all panel labeling throughout building. Includes main electrical panel in lower garage and floor panels. 2.00 $85.00 1 $85.00 $255.00
Subtotal: $255.00

R18. Security Camera Repair

Description Labor Qty Labor Rate Material Qty Material Cost Total
Repair blacked-out security cameras in social lobby and rooftop lobby. Includes diagnosis, repair/replacement, and verification. 4.00 $85.00 2 $340.00 $680.00
Subtotal: $680.00

R19. Hot Water Recirculation Thermometer

Description Labor Qty Labor Rate Material Qty Material Cost Total
Replace broken hot water recirculation thermometer. Required for proper temperature monitoring and logging. 1.00 $85.00 1 $85.00 $170.00
Subtotal: $170.00

R20. A.O. Smith Water Heater Cap Inspection

Description Labor Qty Labor Rate Material Qty Material Cost Total
Inspect and repair A.O. Smith unit cap that appears to be leaking. Includes diagnostic and repair. 2.00 $85.00 1 $85.00 $255.00
Subtotal: $255.00

Yellow Priority Pricing

$0.00

Y1. Cooling Tower Basin Cleaning

Description Labor Qty Labor Rate Material Qty Material Cost Total
This will need to be cleaned on startup (during spring) - sediment should be removed. Will be included in preventative maintenance. n/a n/a n/a n/a n/a
Subtotal: n/a

Y2. Rooftop Coil Cleaning

Description Labor Qty Labor Rate Material Qty Material Cost Total
Cannot be completed during winter. Should be completed in spring as part of preventative maintenance. n/a n/a n/a n/a n/a
Subtotal: n/a

Y3. Pigeon Remediation - Rooftop (Comprehensive)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Comprehensive rooftop pigeon remediation including dead pigeon removal, droppings, feathers, nesting materials. Remove nests and eggs from generator. Install effective deterrent measures. Seal garage vent entry points. 16.00 $85.00 1 $2,040.00 $3,400.00
Subtotal: $3,400.00

Y4. Building-Wide Lighting Standardization

Description Labor Qty Labor Rate Material Qty Material Cost Total
Replace mismatched cool and warm bulbs throughout building with consistent warm lighting. Multiple floors have inconsistent bulb temperatures. 6.00 $85.00 30 $765.00 $1,275.00
Subtotal: $1,275.00

Y5. Common Area Bathroom Repairs (2nd Floor)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Repair faucets, soap dispensers, doors in men's and women's bathrooms. Includes fixture replacement and general maintenance. 4.00 $85.00 4 $170.00 $510.00
Subtotal: $510.00

Y6. Rooftop Amenity Area Refresh

Description Labor Qty Labor Rate Material Qty Material Cost Total
Deep clean grill (needs serious cleaning), clean countertops, repair electrical outlet/plug, restring lights as needed. Does not include outdoor TV replacement. 8.00 $85.00 1 $340.00 $1,020.00
Subtotal: $1,020.00

Y7. Fitness Center Improvements

Description Labor Qty Labor Rate Material Qty Material Cost Total
Install thermostat cover, replace missing return vent covers, general maintenance of exercise equipment area. 2.00 $85.00 2 $170.00 $340.00
Subtotal: $340.00

Y8. Community Room Maintenance

Description Labor Qty Labor Rate Material Qty Material Cost Total
General maintenance including coffee station service, fireplace inspection, TV mounting verification, privacy shade adjustment, and kitchen cabinet alignment. 3.00 $85.00 2 $170.00 $425.00
Subtotal: $425.00

Y9. Trash Room Signage Project

Description Labor Qty Labor Rate Material Qty Material Cost Total
Replace all paper signs with permanent framed signs building-wide in trash and recycling rooms. Lock chemical storage doors. Adjust door closers and latches. 4.00 $85.00 8 $170.00 $510.00
Subtotal: $510.00

Y10. Stairwell A & B Deep Cleaning

Description Labor Qty Labor Rate Material Qty Material Cost Total
Comprehensive cleaning of both stairwells including walls, railings, and treads. Address any graffiti or damage. 8.00 $85.00 n/a n/a $680.00
Subtotal: $680.00

Y11. Floor Drain Flushing (Building-Wide)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Flush all floor drains in retail space, janitorial closet, mechanical rooms, and throughout the building with mineral oil to maintain trap seals. 3.00 $85.00 2 $85.00 $340.00
Subtotal: $340.00

Y12. Building Sign Cleaning

Description Labor Qty Labor Rate Material Qty Material Cost Total
Wash building nameplate/sign. Currently dirty and in need of cleaning. 2.00 $85.00 1 $85.00 $255.00
Subtotal: $255.00

Y13. Curb Line Striping

Description Labor Qty Labor Rate Material Qty Material Cost Total
Inspect and refresh curb striping for fire lanes and no parking zones. Includes assessment and restriping as needed. 3.00 $85.00 2 $170.00 $425.00
Subtotal: $425.00

Y14. Garage Door Revolution Counters

Description Labor Qty Labor Rate Material Qty Material Cost Total
Install revolution counters on both garage doors (Garage 1 and Garage 2) to track spring cycles. No counters currently installed. 2.00 $85.00 2 $170.00 $340.00
Subtotal: $340.00

Y15. Old Mechanical Room (Rooftop) Securing

Description Labor Qty Labor Rate Material Qty Material Cost Total
Lock abandoned equipment room on rooftop. Remove old/abandoned equipment. Secure door to prevent unauthorized access. 2.00 $85.00 1 $85.00 $255.00
Subtotal: $255.00

Y16. Sidewalk Power Washing

Description Labor Qty Labor Rate Material Qty Material Cost Total
Power wash all sidewalks on all sides (5th Street, Wall Street, back alley). Address pigeon droppings on sidewalk areas. 4.00 $85.00 1 $170.00 $510.00
Subtotal: $510.00

Y17. Emergency Manual & Procedures Creation

Description Labor Qty Labor Rate Material Qty Material Cost Total
Create emergency procedure manual reflecting current building systems, contacts, and evacuation routes. 4.00 $85.00 n/a n/a $340.00
Subtotal: $340.00

Y18. Inventory Log Creation

Description Labor Qty Labor Rate Material Qty Material Cost Total
A log to track inventory for items such as filters, parts, cleaning supplies, etc. 4.00 $85.00 n/a n/a $340.00
Subtotal: $340.00

Y19. Air Filter Mapping

Description Labor Qty Labor Rate Material Qty Material Cost Total
Documentation and maps to show where all HVAC filters are located with tags at each unit. Includes rooftop Aeon unit, Panasonic converter, retail space air handler, garage fan coils. 8.00 $85.00 n/a n/a $680.00
Subtotal: $680.00

Y20. Emergency/Exit Light Mapping

Description Labor Qty Labor Rate Material Qty Material Cost Total
Documentation and maps to show where all emergency lights and exit signs are located with tags in each space. Also includes emergency shutoff mapping. 8.00 $85.00 n/a n/a $680.00
Subtotal: $680.00

Y21. Window Washing (Exterior - All 8 Floors)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Will need to be quoted by an external vendor. Professional exterior window cleaning for all building windows across 8 floors. SMS can manage this project. n/a n/a n/a n/a n/a
Subtotal: n/a

Y22. Elevator Room Cleaning

Description Labor Qty Labor Rate Material Qty Material Cost Total
The elevator company should clean and organize this room as part of their contract. Verify elevator permit is current and properly posted. n/a n/a n/a n/a n/a
Subtotal: n/a

Capital Items

Capital items are larger projects that require separate bidding and are not included in the pricing totals above.

See descriptions for estimates

C1. Outdoor TV Replacement (Rooftop)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Replace weathered outdoor TV on rooftop amenity area. SMS estimates this will cost $800 - $1,500 depending on size and weather rating. SMS can manage this project. n/a n/a n/a n/a $800 - $1,500
Estimated Range: $800 - $1,500

C2. Window Washing - Full Building (8 Floors)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Professional exterior window cleaning for all 8 floors. SMS estimates this will cost $3,000 - $5,000 depending on vendor. SMS can manage this project. n/a n/a n/a n/a $3,000 - $5,000
Estimated Range: $3,000 - $5,000

C3. Generator Full Overhaul

Description Labor Qty Labor Rate Material Qty Material Cost Total
Comprehensive generator overhaul including all mechanical and electrical components. Install effective pigeon deterrent cage. SMS estimates this will cost $8,000 - $15,000 depending on scope. SMS can manage this project. n/a n/a n/a n/a $8,000 - $15,000
Estimated Range: $8,000 - $15,000

C4. Pigeon Deterrent Fencing (Permanent Solution)

Description Labor Qty Labor Rate Material Qty Material Cost Total
Install permanent pigeon deterrent system using brick/patio pavers instead of screwed fencing (protects roof membrane). SMS estimates this will cost $2,500 - $4,000. SMS can manage this project. n/a n/a n/a n/a $2,500 - $4,000
Estimated Range: $2,500 - $4,000

C5. Parking Garage Concrete Repair

Description Labor Qty Labor Rate Material Qty Material Cost Total
Address any concrete deterioration in both garage levels. SMS can coordinate external vendor quotes for assessment and repair. n/a n/a n/a n/a TBD
Estimated: TBD

Order History

Track all submitted orders, their status, and completion details.

No Orders Yet

Orders submitted from the pricing tabs will appear here with status tracking. Use the "Order Service" or "Order Training" buttons on any item to get started.

Jobber Portal

Access your Jobber account for invoices, payments, and service scheduling.

Invoices & Payments

View and pay outstanding invoices, download receipts, and manage payment methods.

Open in Jobber →

Schedule Service

Request a service visit, schedule maintenance, or book a consultation with Saturday Services.

Schedule Now →
Jobber Integration

When connected, orders submitted through this platform will automatically create quotes in Jobber. Your team can then review, approve, and schedule work directly. Invoices and payment status will sync back here.

Your Order (0 items)

No items in your order yet.
Use the order buttons on each item to get started.